Kenogami Road Reconstruction - Phase 2.
Complete rock and boulder excavation as required.
Replace sections of storm sewer.
Replace catch basins, catch basin leads & catch basin manholes and re-establish all existing connections into structures.
Replace sections of sanitary sewer.
Replace manholes and re-establish all existing connections into structures.
Establish temporary potable water system, including testing.
Remove and replace sections of existing watermain and appurtenances.
Complete watermain crossing.
Replace concrete curb and gutter, sidewalks and asphalt.
Year:
2021
Owner:
Township of Terrace Bay
Consultant:
KGS Group