Sioux Lookout Meno-Ya-Win Health Centre
Supply and install approximately 550 meters of water main including hydrants, gate valves and connections. Remove and replace existing storm sewers and catch basin leads. Full restoration to asphalt.
Year:
2007 Enabling Works
2008 - 2010 Subcontractor to EllisDon Corporation
Owner:
Sioux Lookout Meno-Ya-Win Health Centre
Consultant:
n/a