Rehabilitation of Van Horne Avenue.

Replace sections of storm sewer and sanitary sewer. 
Replace catch basins, catch basin leads, catch basin manholes and manholes. 
Re-establish all existing connections into structures. 
Remove and replace sections of existing 150mm and 100mm watermain. 
Construct new sections of 150mm watermain c/w appurtenances from existing or new watermain and connect to existing water service. 
Install new 3-way fire hydrants c/w appurtenances. 
Replace concrete curb and cutter, sections of sidewalk and place asphalt. 

Year:

2020

Owner:

City of Dryden

Consultant:

KGS Group