Water and Wastewater Systems Upgrade.

3,500 m of watermain installation including a lake crossing.
2,050 m of water service line installation with residential pipe connections.
820 m of forcemain installation including a lake crossing. 
5,500 m3 of rock blasting. 
Upgrading of two lift stations and the conversion of the existing water treatment plant into a booster station.
Decommissioning of the existing sewer treatment plant and lagoon.
Restoration works. 

Year:

2019

Owner:

Wauzhushk Onigum Nation

Consultant:

JR Cousin Consultants Ltd.